July 1, 2025

Updated: Jul 14

The septic field was dug and hooked up to the house in late June. The concrete was poured in the garage floor. The entire interior of the house was painted as well. The countertops were put in everywhere. We had flooring installed and then it was covered with some brown paper to keep it in good condition while the rest of the interior trim outs take place over the next few days. Lighting fixtures were installed and some are still in the process of being installed.


 
 
 