January 30, 2025
- Kristin Manning
- Jan 30, 2025
- 1 min read
The concrete was poured today for the footing.
The water lines were inspected and they started covering up the trench that ran alongside the gravel driveway. It looks pretty smooth. One part was left open for future connection to the house.
They also moved some dirt around in the small creek that runs underneath the driveway before you reach the pond, so that the water will move better through the drain pipe.