top of page
Search

January 30, 2025

The concrete was poured today for the footing.




The water lines were inspected and they started covering up the trench that ran alongside the gravel driveway. It looks pretty smooth. One part was left open for future connection to the house.



They also moved some dirt around in the small creek that runs underneath the driveway before you reach the pond, so that the water will move better through the drain pipe.





 
 
 

Recent Posts

See All

Comments


Details

​1436 Dickinson Rd

Smithfield, NC 27577

  • Black Facebook Icon
  • Black Instagram Icon

© 2024 by Manning Ventures.
Powered and secured by Wix

bottom of page